Path: ccsf.homeunix.org!CALA-MUZIK!newsfeed.media.kyoto-u.ac.jp!newsfeed.gamma.ru!Gamma.RU!postnews.google.com!m7g2000cwm.googlegroups.com!not-for-mail From: declan_murphy@hotmail.com Newsgroups: fj.life.in-japan Subject: Re: Declan's school Date: 5 Oct 2006 02:01:46 -0700 Organization: http://groups.google.com Lines: 34 Message-ID: <1160038906.898118.54350@m7g2000cwm.googlegroups.com> References: <1hlq04u.f0mht41950ookN%al@privacy.ne.jp> <1158513021.939774.270610@h48g2000cwc.googlegroups.com> <1hlvazv.yyviht1u83mp6N%al@privacy.ne.jp> <1158912340.697996.110160@e3g2000cwe.googlegroups.com> <1159721334.080629.135530@i3g2000cwc.googlegroups.com> NNTP-Posting-Host: 124.99.87.85 Mime-Version: 1.0 Content-Type: text/plain; charset="iso-8859-1" X-Trace: posting.google.com 1160038910 9914 127.0.0.1 (5 Oct 2006 09:01:50 GMT) X-Complaints-To: groups-abuse@google.com NNTP-Posting-Date: Thu, 5 Oct 2006 09:01:50 +0000 (UTC) In-Reply-To: <1159721334.080629.135530@i3g2000cwc.googlegroups.com> User-Agent: G2/1.0 X-HTTP-UserAgent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; .NET CLR 1.1.4322; Alexa Toolbar),gzip(gfe),gzip(gfe) Complaints-To: groups-abuse@google.com Injection-Info: m7g2000cwm.googlegroups.com; posting-host=124.99.87.85; posting-account=XTFokQ0AAAB4DUZc9t8fM3qc5a_bh2nQ Xref: ccsf.homeunix.org fj.life.in-japan:164452 Jason Cormier wrote: > declan_murphy@hotmail.com wrote: > > > and why an additional 6 classrooms are being added to the 2nd floor of > > Aoi Hall. Hopefully 19 classrooms will be enough for the new SILAC > > curriculum. > > 19 classrooms? I remember when Aoi Hall had just opened. IIRC, there > were about 8-10 classes upstairs, plus the teachers office and a > computer lab (or two). Downstairs would eventually become your offices, > some kind of theatre/hall and the pub. Has there been another expansion > or have my memories decieved me in regards to the set-up on the second > floor? I'm pretty sure you are in this photo http://www.yamasa.org/acjs/english/aoi_dl6_photo.html where the floor of the theatre has been completed but not the desks - so my guess is that would be summer 2000. That was stage 3 of the expansions. Stage 1 was about 15 months earlier. The current construction is expansion #5. Back in 2000 there would have been 12 classrooms, an enlarged teacher's office (that was when we ripped the wall out of the existing teacher's office to include the adjoining classroom, and why that office has 2 sets of doors), and then 2 PC labs upstairs, with my former office, theatre, radio station, office space etc down stairs. This renovation will probably be the last for Aoi Hall. There is a bit of info in http://www.yamasa.org/acjs/network/english/newsletter/latest.html but no photos yet (construction crews sign off tomorrow).